Genie photo bombs an aerial photo of the construction of a new Magic Kingdom ferry. Top right, near the service marina North of Contemporary resort.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+37 more Fewer
Jump to a month
Aerial photos of construction of a new Magic Kingdom ferry in the service marina North of Contemporary Resort. Will be named the Meg Gilbert Crofton.
Aerial photo of construction of the hull of a new Magic Kingdom ferry. The Meg Gilbert Crofton. As seen in the service marina North of Contemporary Resort.
Aerial photo today of construction of Harryhausen's in Monstropolis.
Aerial overview of construction of the Monsters Inc. roller coaster in Disney's Hollywood Studios.
Aerial overviews of current building frame for the Monsters Inc roller coaster in Disney's Hollywood Studios. Multiple floors are developing in this area. Track is starting to be placed for the service floor of the ride. Highest supports are for ride track in the first scene.
Arrows in these aerial photos at the first track bolted to a support for the Monsters Inc. suspended door roller coaster. In Disney's Hollywood Studios. This track is at the likely service floor for the ride. Large supports above are for ride track through the first scene.
Aerial photo of 3 sections of track inside the building frame of the Monsters Inc. roller coaster. • Arrow at suspended track attached to a support. • In front are two curved sections staged on wood. To be bolted soon. This track at the likely service floor for the ride.
An aerial look inside the building frame of the Monsters Inc. roller coaster. Bottom arrow at the first section of suspended rail track bolted to the frame. This track is likely at a lower floor service area of the attraction. Large supports above will hold ride track.
Aerial look at construction of the Monsters Inc. roller coaster. Some of the frame is at full height. At center are 2 curved sections of track that will soon be bolted to the frame. Track at this level for the service area. Look close at center to see a 3rd section of track.
Aerial photos of track that has been raised into the building frame of the Monsters Inc. roller coaster. Not yet bolted in place. Rails resting on wood. This floor likely is the service area of the suspended door attraction.
Aerial photo of construction of the Monsters Inc. roller coaster. Upper level of this suspended door ride will have scene 1's. Tracks to merge into a single routing in the area at top center. Arrow at track pending for a lower floor service area of the ride.
Aerial photo of curved track that has been raised into the building frame of the Monsters Inc. roller coaster. These two track sections are not yet in bolted in place. Rails (for suspended door cars) are resting on wood.
An aerial look back at track sections staged for the Monsters Inc. suspended door roller coaster. Section at left is on stands to keep rails off the ground. As seen 2 days ago, Jun 19. Raised yesterday. Next few aerial photos posted will show these inside the building frame.
A CityWalk view of Fast & Furious Hollywood Drift constructions. • Cars will travel right to left in the large radius track seen. • An overbanked turn will span the tall A-frames. Cars travelling left to right.