June 21, 2026
6:49 PM
Aerial look at construction of the Monsters Inc. roller coaster. Some of the frame is at full height.
At center are 2 curved sections of track that will soon be bolted to the frame. Track at this level for the service area.
Look close at center to see a 3rd section of track.