June 21, 2026
7:07 PM
An aerial look inside the building frame of the Monsters Inc. roller coaster. Bottom arrow at the first section of suspended rail track bolted to the frame.
This track is likely at a lower floor service area of the attraction. Large supports above will hold ride track.