Aerial photo of part of Lost Continent. Entrance of the former Poseidon's Fury.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
Jump to a month
Show every monthAerial photo of where trees were recently removed in Lost Continent.
Aerial photo of Orlando Fire Dept trucks parked behind Lost Continent. Likely for a safety inspection. Trucks ready to leave immediately if an emergency response is needed in the City.
Aerial look at the bridge refurbishment between Lost Continent and Seuss Landing. Scaffolding and scrims on one side, where railing work continues. The bridge deck character changed from planks secured with rivets, to what may be theming as weathered and worn.
Aerial photo of The Lost Continent in Islands of Adventure. Some trees were recently removed at bottom right.
Christmas lighting in Hogsmeade.
Pyro in The Magic of Christmas at Hogwarts Castle show. Rising above Hogsmeade.
A look at the guest areas outside of the former theater in Lost Continent.
Work starting in Lost Continent. Construction fence recently added at former Poseidon's Fury. Water still flowing in the waterfall and cascade.
Refurbished bridge deck fully open between Seuss Landing and Lost Continent. Work continues behind the scrim for the railing on the lagoon side.
Seuss Landing waterfront has reopened after a refurbishment.
This season's Orlando Informer Meetup uses a familiar Back of House route between parks. Which now crosses through roller coaster construction.
New bridge deck has themed imperfections and aging. Between Lost Continent and Seuss Landing.
Photos of the deck of the bridge between Lost Continent and Seuss Landing. • 1st photo, the newly refurbished surface. • 2nd photo, original theming of rivets and wood. Universal recently announced there will be changes in Lost Continent...
Bridge refurbishment switched sides today. Between Lost Continent and Seuss Landing.