November 21, 2025
12:58 AM
Refurbished bridge deck fully open between Seuss Landing and Lost Continent.
Work continues behind the scrim for the railing on the lagoon side.
Refurbished bridge deck fully open between Seuss Landing and Lost Continent.
Work continues behind the scrim for the railing on the lagoon side.