the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026

883 photos in June 2026

Clear all Grid Feed
More filters ↓

Jump to a month

Show every month
June 22, 2026 12:43 AM

Aerial photo of the Liberty Belle riverboat. In the service marina North of Contemporary Resort.

June 22, 2026 12:35 AM

Aerial photos of Magic Kingdom ferry construction and the Liberty Belle riverboat in the service marina North of Contemporary resort.

June 22, 2026 12:27 AM

Aerial look at the Walt Disney World North Service Area. Monorail and steam train shop at top center. Guests can sometimes tour the large building at center. Ride vehicle refurbishment and other work for the parks. Magic Kingdom service marina also seen. With ferry construction.

June 22, 2026 12:18 AM

A nearly straight down aerial photo of construction of a new Magic Kingdom ferry. = Only Disney knows the plan. Could be that the ship moves inside the service building for final detailing after the top deck is added. As seen in the service marina North of Contemporary resort.

June 22, 2026 12:05 AM

Genie photo bombs an aerial photo of the construction of a new Magic Kingdom ferry. Top right, near the service marina North of Contemporary resort.

June 21, 2026 11:57 PM edited

Aerial photos of construction of a new Magic Kingdom ferry in the service marina North of Contemporary Resort. Will be named the Meg Gilbert Crofton.

June 21, 2026 11:49 PM

Aerial photo of construction of the hull of a new Magic Kingdom ferry. The Meg Gilbert Crofton. As seen in the service marina North of Contemporary Resort.

June 21, 2026 8:08 PM

Aerial photo today of construction of Harryhausen's in Monstropolis.

June 21, 2026 8:00 PM

Aerial overviews of current building frame for the Monsters Inc roller coaster in Disney's Hollywood Studios. Multiple floors are developing in this area. Track is starting to be placed for the service floor of the ride. Highest supports are for ride track in the first scene.

June 21, 2026 7:49 PM

Aerial photos of color coded groups of bolts in the foundation of the Monsters Inc. roller coaster building.

June 21, 2026 7:34 PM

Arrows in these aerial photos at the first track bolted to a support for the Monsters Inc. suspended door roller coaster. In Disney's Hollywood Studios. This track is at the likely service floor for the ride. Large supports above are for ride track through the first scene.

June 21, 2026 7:16 PM

Aerial photo of 3 sections of track inside the building frame of the Monsters Inc. roller coaster. • Arrow at suspended track attached to a support. • In front are two curved sections staged on wood. To be bolted soon. This track at the likely service floor for the ride.

June 21, 2026 7:07 PM

An aerial look inside the building frame of the Monsters Inc. roller coaster. Bottom arrow at the first section of suspended rail track bolted to the frame. This track is likely at a lower floor service area of the attraction. Large supports above will hold ride track.

Older → ↩ Back to the newest