the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,792
photos
21,321
posts
spanning
November 2023 – August 2026
latest
August 3, 2026

903 photos in May 2026

Clear all Grid Feed
More filters ↓

Jump to a month

Show every month
May 2, 2026 3:39 PM

Aerial photo that shows how guests aboard Universal buses can't peek into an Epic Universe expansion pad. Due to a high wall on the raised roundabout.

May 2, 2026 3:28 PM

At right in this aerial photo is a steadily growing section of trailer offices. Could be the Epic Universe expansion pad in foreground is in development as staging and project management for a new attraction in The Wizarding World's expansion pad at top of this photo.

May 2, 2026 2:25 PM

In this aerial photo of Music Plaza: • Footers for Fast & Furious Hollywood Drift at top left • Two routes between USF and IOA for Grad Bash and Gradventure. • Students crossover at left, with arch. • Route at right is multiple use. Students arriving at the event. Chaperones.

May 2, 2026 2:05 PM

Aerial photo of switch track construction at Fast & Furious Hollywood Drift. In first photo, concrete forms are being removed. Including underneath. Footers also being cast for track to access the service building.

May 2, 2026 1:59 PM

Aerial overview of construction at the Fast & Furious Hollywood Drift station. Two switch track platforms. Train direction clockwise, allowing for train queuing before entering two unload/load areas.

May 2, 2026 1:45 PM

At center of this aerial photo is concrete curing for track footers of Fast & Furious Hollywood Drift. Track between the service building and the switch track platform. Trains entering the ride circuit will transfer at the platform then enter station for ride operator inspection.

May 2, 2026 1:39 PM

Aerial photo of Fast & Furious Hollywood Drift construction. • Station at right. • Maintenance building at left. • Two switch track platforms. • Train direction clockwise. Allowing trains to queue for unload/load at left.

May 2, 2026 1:30 PM

Aerial photo of the service building for Fast & Furious Hollywood Drift, with a small section of siding at right to be competed. 2nd photo from in-park a short time later. Siding completed at right.

May 2, 2026 1:25 PM

Aerial photos of roof and siding work for the Fast & Furious Hollywood Drift maintenance building, and other uses. Interesting gap in the side. Steel frame in back likely for a crane to transfer ride vehicles between trucks and carts.

Older → ↩ Back to the newest