the BERM record Walt Disney World Map Archive
May 2, 2026 1:45 PM

At center of this aerial photo is concrete curing for track footers of Fast & Furious Hollywood Drift. Track between the service building and the switch track platform.
Trains entering the ride circuit will transfer at the platform then enter station for ride operator inspection.

View original on Mastodon