the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,826
photos
21,350
posts
spanning
November 2023 – August 2026
latest
August 6, 2026

6,081 photos match

Clear all Grid Feed
More filters ↓

Jump to a month

April 24, 2026 7:30 PM

Aerial photo showing that a recently started utility project in Universal now spans into the construction site of Fast & Furious Hollywood Drift

April 24, 2026 7:01 PM

Aerial overview of construction at the station of Fast & Furious Hollywood Drift. Track recently placed for the dual load/unload of the attraction. Two concrete platforms are seen for switch track. The platform at top center was recently cast. Ride service building at top right.

April 24, 2026 5:00 PM

Aerial photos of dragons being prepared for flight over The Isle of Berk.

April 24, 2026 4:28 PM

Aerial photos of a dragon staged for flight over The Isle of Berk. Seen in an Epic Universe Back of House area.

April 24, 2026 4:04 PM

A nearly straight-down aerial look at dragons staged for flight over The Isle of Berk. In a Back of House area of Epic Universe.

April 24, 2026 2:46 AM

Theming in progress at the Hogwarts Castle refurbishment. Today, and yesterday. Varying colors are applied to individual stones. Additional layers of paint for overall stone color will have translucency. When complete the theming will have visually appealing variations.

April 23, 2026 2:39 AM

A look at construction of The Spike of Fast & Furious Hollywood Drift. At center (arrow) is a line of footers for the rising up into The Spike, and falling back down. Arrow at right at rows of rectangular footers for the switch track.

April 23, 2026 2:31 AM

There are many details to zoom in and explore in this photo of the Fast & Furious Hollywood Drift work site. At center is a recently cast concrete platform. Likely for another switch track near the station. Scissor lifts are on second floor of the service building construction.

April 23, 2026 2:24 AM

At center is a recently cast concrete platform at Fast & Furious Hollywood Drift. Jacks are still underneath. There are also circular castings with bolts on the platform. Seems like this is for a second switch track near the station.

April 23, 2026 1:45 AM

Most trees removed from the former The Eighth Voyage of Sinbad theater area. Second photo Apr 2. Demolition of The Lost Continent in progress.

Older → ↩ Back to the newest