Aerial photo showing that a recently started utility project in Universal now spans into the construction site of Fast & Furious Hollywood Drift
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,826
- photos
- 21,350
- posts
- spanning
- November 2023 – August 2026
- latest
- August 6, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+40 more Fewer
Jump to a month
Arrow in this aerial photo at where the Fast & Furious Hollywood Drift fence used to be. As seen in second photo. Utility project now spans into the roller coaster site.
Aerial overview of construction at the station of Fast & Furious Hollywood Drift. Track recently placed for the dual load/unload of the attraction. Two concrete platforms are seen for switch track. The platform at top center was recently cast. Ride service building at top right.
Aerial photos of support and track staging for Fast & Furious Hollywood Drift.
Aerial photos of some of the track staged for Fast & Furious Hollywood Drift. Much track seen earlier is now in place at the attraction.
Aerial photo of a track support being unloaded in a staging yard for Fast & Furious Hollywood Drift.
Aerial photos of dragons being prepared for flight over The Isle of Berk.
Aerial photos of a dragon staged for flight over The Isle of Berk. Seen in an Epic Universe Back of House area.
A nearly straight-down aerial look at dragons staged for flight over The Isle of Berk. In a Back of House area of Epic Universe.
Theming in progress at the Hogwarts Castle refurbishment. Today, and yesterday. Varying colors are applied to individual stones. Additional layers of paint for overall stone color will have translucency. When complete the theming will have visually appealing variations.
A look at construction of The Spike of Fast & Furious Hollywood Drift. At center (arrow) is a line of footers for the rising up into The Spike, and falling back down. Arrow at right at rows of rectangular footers for the switch track.
There are many details to zoom in and explore in this photo of the Fast & Furious Hollywood Drift work site. At center is a recently cast concrete platform. Likely for another switch track near the station. Scissor lifts are on second floor of the service building construction.
At center is a recently cast concrete platform at Fast & Furious Hollywood Drift. Jacks are still underneath. There are also circular castings with bolts on the platform. Seems like this is for a second switch track near the station.
A look at track placed for Fast & Furious Hollywood Drift. Wood railings are around the switch track platform near the station.
Most trees removed from the former The Eighth Voyage of Sinbad theater area. Second photo Apr 2. Demolition of The Lost Continent in progress.