the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
More filters ↓

Jump to a month

July 25, 2026 11:23 PM

A current CityWalk view of Fast & Furious Hollywood Drift.

July 25, 2026 11:16 PM

Peer through the intertwined track of Fast & Furious Hollywood Drift. In background are the hills at Music Plaza. Launching track, at right, will have the cars tilted at 70-degrees or more at top of the hill.

July 25, 2026 11:12 PM

Two views of the Fast & Furious Hollywood Drift tracks at Music Plaza. The shared support structure is well-hidden when viewed from the Plaza..

July 25, 2026 11:06 PM

Higher track added at Music Plaza for cars returning to the Fast & Furious Hollywood Drift station. A shared support structure between the two tracks is well-hidden.

July 25, 2026 11:00 PM

Fast & Furious Hollywood Drift track for cars returning to the station was added at left. Track is higher so cars can be seen well in Music Plaza. Shared support structure also for the launch track at right. The structure is hidden well when viewed in-park.

July 25, 2026 3:18 AM

Aerial overview of construction of Fast & Furious Hollywood Drift. Also seen: • Demolition of The Lost Continent • Street closed at refurbishment of Finnegan’s • Site clearing for Luke Combs' Category 10 • Scrims for repainting the gateway arch * New turf at Music Plaza

July 25, 2026 3:11 AM

Aerial overview of Fast & Furious Hollywood Drift seen through cloud shadows. Demolition of The Lost Continent at top left.

July 25, 2026 3:06 AM

Aerial photo of the 170-ft tall Spike at Fast & Furious Hollywood Drift. Concrete forms for a garden wall are underneath.

July 25, 2026 3:01 AM

Arrow in the aerial photo where a footer has been partially removed at Fast & Furious Hollywood Drift. (A team was observed yesterday carefully removing concrete around the bolts with jackhammer.) In 2nd photo, hours after aerial: 1 Track connection 2 Bolts removed 3 Excavation.

July 25, 2026 2:42 AM

Aerial photos of Fast & Furious Hollywood Drift construction near CityWalk.

July 25, 2026 2:35 AM

Aerial photo of current development of a collection of utility areas for Fast & Furious Hollywood Drift.

July 25, 2026 2:29 AM

Aerial photo of Fast & Furious Hollywood Drift near switch track for The Spike. A very tall support structure is in development at left.

July 25, 2026 2:07 AM

Aerial overview of Fast & Furious Hollywood Drift construction behind Music Plaza.

July 25, 2026 2:03 AM

Aerial photos of construction of Fast & Furious Hollywood Drift near the station.

July 25, 2026 1:56 AM

Aerial photo of the interleaved levels of Fast & Furious Hollywood Drift at the station. 1,2 Structural frame for Scene 1. Cars leave the station through switch track, turning right. Then launch. 3 Service walkways for returning track. 4 Frame for raised floor at switch track.

Older →