the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
More filters ↓

Jump to a month

July 18, 2026 2:57 PM

Aerial photo of construction of the Monsters Inc roller coaster at Disney's Hollywood Studios.

July 18, 2026 2:53 PM

Aerial photo of construction of the Monsters Inc. factory (suspended door roller coaster) and Monstropolis at Disney's Hollywood Studios.

July 18, 2026 2:49 PM

Aerial photo of construction of Monstropolis. Yellow areas for floor of the themed factory exterior of Monsters Inc.

July 18, 2026 2:43 PM

Aerial photos of scaffolded areas for theming the city of Monstropolis in Disney's Hollywood Studios.

July 18, 2026 2:36 PM

Aerial photos of scaffolded areas for theming the city of Monstropolis in Disney's Hollywood Studios. Structural frame was recently added for the exterior of Harryhausen's restaurant.

July 18, 2026 2:07 PM

Aerial photo of the development of the front of Monstropolis in Disney's Hollywood Studios. • Colorful patterned concrete is being cast • Concrete columns for a gateway were cast tall. Have been trimmed. Sections in a dumpster.

July 18, 2026 2:02 PM

Aerial photo of the development of the front of Monstropolis in Disney's Hollywood Studios. • Colorful concrete is being cast near Grand Avenue • Concrete columns for a gateway were cast tall. Have been trimmed. Sections in a dumpster. • Concrete forms for a garden wall.

July 18, 2026 1:38 PM

Aerial photo of construction of Monstropolis and the Monsters Inc roller coaster.

July 18, 2026 1:28 PM

Aerial overviews of construction of the Monsters Inc roller coaster.

July 18, 2026 1:23 PM

Aerial photos of construction of the Monsters Inc roller coaster. Recently cast foundations seem to be for rows of a service area for the trains.

July 18, 2026 1:13 PM

In this aerial photo of the Monsters Inc roller coaster: - Lower supports at left for trains entering unload - Higher supports for a portion of the ride above unload - Yellow water barriers where concrete floors will be cast for the exit gift shop and part of the queue.

July 18, 2026 1:04 PM

Aerial photos of where scene 1 will be for the Monsters Inc roller coaster. Trains of suspended door cars will rise into this area. Curve to the left after transferring through a doorway into the rack-like storage system of the story.

July 18, 2026 12:53 PM

Aerial photo peering inside the construction of the Monsters Inc roller coaster. Trains of suspended door cars will rise and enter this area. A pair of rails at bottom left are believed to be for the maintenance bay.

July 18, 2026 12:47 PM

Aerial photo peering inside the construction of the Monsters Inc roller coaster. Steel for floor will soon hide track supports underneath.

July 18, 2026 12:18 PM

Aerial overview of construction of the Monsters Inc roller coaster at Disney's Hollywood Studios.

Older →