the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
More filters ↓

Jump to a month

July 25, 2026 3:12 PM

Site prep for Luke Combs' Category 10 in CityWalk.

July 20, 2026 2:19 AM

Aerial photo of the construction site for Luke Combs' Category 10 in CityWalk.

July 19, 2026 11:43 PM

Aerial photos of Fast & Furious Hollywood Drift track near the CityWalk waterfront.

July 19, 2026 10:54 PM

In these aerial photos, track veers right for cars entering the CityWalk area of Fast & Furious Hollywood Drift. Supports can be seen for where track will span across a commonly-used crossover between Universal Studios Florida, Islands of Adventure, and #HHN soundstage houses.

July 17, 2026 2:00 AM

Fast & Furious Hollywood Drift in the CityWalk area. (The Spike is out of view at right.)

July 12, 2026 12:30 PM

Aerial photo of the soon-to-open access for buses to directly enter the CityWalk loop from Universal Blvd.

July 12, 2026 12:24 PM

Aerial photos of the construction site of Luke Combs' Category 10 in CityWalk. (July 10)

July 11, 2026 2:33 AM

Aerial overview of Fast & Furious Hollywood Drift construction near CityWalk.

July 11, 2026 2:29 AM

Aerial photos of Fast & Furious Hollywood Drift construction near CityWalk.

July 11, 2026 1:21 AM

Aerial photo of current track segments of Fast & Furious Hollywood Drift near CityWalk.

July 10, 2026 12:55 AM

Demolition in CityWalk to prepare for construction of Luke Combs' Category 10.

July 3, 2026 12:31 AM

Fast & Furious Hollywood Drift graphics have been added at the construction fence near CityWalk.

July 2, 2026 1:32 AM

View of 170-ft tall Spike of Fast & Furious Hollywood Drift from the CityWalk waterfront. Cars will twist around 180° as they rise to the top, then descend into the rest of the ride.

July 1, 2026 3:43 AM

Platform demolition in CityWalk at the construction site of Luke Combs' Category 10.

Older →