the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
More filters ↓

Jump to a month

Show every month
May 31, 2026 5:53 PM

Construction of Fast & Furious Hollywood Drift seen from near the globe. Current height of the 170-ft tall Spike element.

May 31, 2026 5:50 PM

Waterfront view of construction of The Spike for Fast & Furious Hollywood Drift.

May 31, 2026 5:46 PM

Current waterfront views of The Spike construction for Fast & Furious Hollywood Drift.

May 31, 2026 5:39 PM

Track supports lined up for The Spike of Fast & Furious Hollywood Drift.

May 30, 2026 12:30 PM

Aerial look at demolition underway in Islands of Adventure. • Front theming recently removed at the Sinbad theater • Trees removed also near the trident in front of Poseidon's Fury.

May 30, 2026 12:26 PM

Aerial photos of demolition in progress of the Sinbad theater in Islands of Adventure.

May 30, 2026 12:13 PM

Aerial look at demolition in progress in Islands of Adventure. Front theming of the Sinbad theater recently removed.

May 30, 2026 12:01 PM

Aerial photo of Poseidon's Fury and nearby areas. Demolition of The Lost Continent is in progress.

May 30, 2026 11:44 AM

Aerial photo of the contrast of forest at the entrance of Hogwarts Express and the demolition of The Lost Continent.

May 30, 2026 11:28 AM

Aerial photo of Mystic Fountain and demolition of front of the Sinbad theater in Islands of Adventure.

May 30, 2026 3:31 AM

Aerial overviews of construction for the Monstropolis door roller coaster.

May 30, 2026 3:20 AM

Aerial overviews of the construction of the Monstropolis door roller coaster.

May 30, 2026 3:12 AM

Aerial photos of Monstropolis roller coaster construction. Seems like grey steel inside structural steel is for a pair of scene 1. The ride continues through the black supports, with ride routes merging as single path through the story.

Older →