the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
Property
Park / area
More filters ↓
Project
Fast & Furious: Hollywood Drift 75 Tropical Americas 33 Piston Peak 25 Monstropolis roller coaster 16 refurbishment of Hogwarts Castle 11 refurbishment of Jurassic Park River Adventure 8 Lakeshore Lodge 6 Villains land 6
+40 more

Jump to a month

Show every month
2025
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
March 28, 2026 11:07 PM edited

Aerial overview of construction sites of • Villains land • Piston Peak National Park At center is a tree that will be transplanted from the forest that used to line Rivers of America. Other trees that were moved are at top left. It's possible these trees will move again...

March 28, 2026 11:02 PM

Aerial overview of construction sites of • Piston Peak National Park • Villains land

March 19, 2026 9:42 AM

At center of this aerial photo is drainage pipe staged for construction in Magic Kingdom. Likely for both Piston Peak National Park and Villains Land.

March 19, 2026 9:28 AM

Scrims/scaffolding at top center of this aerial photo are for the refurbishment of The Haunted Mansion exterior. Top left is preparation for Villains land. Near center is a retaining wall for Piston Peak National Park. Dirt is being placed at right, near the former riverboat landing.

March 19, 2026 9:05 AM

At center of this aerial photo is the work site for Piston Peak National Park. A retaining wall is in development from Big Thunder Mountain Railroad to Liberty Square. Bottom right is site preparation for Villains Land.

March 5, 2026 2:02 PM

Speaking of Villains land... ... a very interesting hands-on lab I attended. Using browser easily to break into an example server in multiple ways.