Aerial photos of Catchlight Crossings. Affordable housing that Universal is developing near Epic Universe.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
Jump to a month
Show every monthIn foreground is the construction site for the expansion of Celestial Park in Epic Universe.
Aerial overview of Celestial Park.
Aerial overview of the Isle of Berk.
At center of this aerial photo is the rarely used pad for flying dragons in the Isle of Berk.
Aerial photos of what seems to be site preparation for an asphalt road on the Epic Universe fireworks peninsula. Road leading to the recently added concrete launch pad.
Aerial photos of staging near the Epic Universe fireworks peninsula.
Aerial photo of current development of the Epic Universe fireworks launch peninsula.
Aerial photos of Epic Universe expansion pads.
Aerial photos of site preparation for a development in Celestial Park.
At top left of this aerial photo is an expansion of Celestial Park.
Aerial photos of Fast and Furious Hollywood Drift track staged near Epic Universe. Covered in tarps in now. Will likely be placed soon in the maintenance building under construction in Universal Studios Florida.
Aerial photos of Fast and Furious Hollywood Drift track staged near Epic Universe. Covered in tarps, and will likely be placed soon in the maintenance building in Universal Studios Florida.
Aerial photo of Fast and Furious Hollywood Drift track staged near Epic Universe. Covered in tarps. Curved sections at bottom right will likely lead to straight sections at top center in the maintenance building. At bottom left are supports for this track.
Aerial photo of Fast and Furious Hollywood Drift track staged near Epic Universe. Covered in tarps. Likely for the service bays. Straight sections for train maintenance at right. Curves to lead to each straight run at left. At top are supports for this track.