the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
More filters ↓

Jump to a month

Show every month
December 23, 2025 12:28 PM

Aerial photo of a roundabout near Grand Floridian Resort. Interesting design, not a perfect circle. Part of the rerouting of Floridian Way.

December 23, 2025 12:25 PM edited

Aerial photo of a roundabout near Grand Floridian Resort. Interesting design, not a perfect circle. Part of the rerouting of Floridian Way.

December 23, 2025 12:18 PM

Aerial photo of where a roundabout will be added in the rerouting of Floridian Way. At entrance of Grand Floridian Resort.

December 23, 2025 12:08 PM

Aerial photo of the rerouting of Floridian Way in progress near Grand Floridian Resort. One roundabout is ready for landscaping. Another roundabout will be added at right, in the large cleared area of the project.

December 23, 2025 11:59 AM

Aerial photo of Floridian Way widening in progress near Polynesian Resort. Lanes are ready for an upcoming shift in traffic flow. The Walt Disney World Half Marathon and full Marathon pass through here on Jan 10 and 11.

December 23, 2025 11:54 AM

Aerial photo of traffic improvement in progress near the new guest entrance of Polynesian Resort. Floridian Way, at bottom of this photo, is being widened.

December 23, 2025 11:51 AM

Aerial photo with barricades, fences, and construction near the Porte-cochère of Polynesian Resort. Interesting to zoom in and imagine the traffic flows during the transition of moving the guest entrance (which is out of frame, bottom right).

December 23, 2025 11:42 AM

Aerial overview of Polynesian Resort. New guest entrance near the intersection in bottom right.

December 20, 2025 3:37 PM

Disney cloaking devices outside the former Wyland Galleries in Boardwalk Resort. There's been recent sidewalk replacement outside the shop.

December 14, 2025 4:23 AM

Monorail view of the Lakeshore Lodge construction site.

December 2, 2025 10:02 AM

Nov 30 aerial overview of the service marina North of Contemporary resort. As seen from 3200 ft.

December 2, 2025 10:00 AM

Nov 30 aerial photo of Liberty Belle riverboat in the service marina North of Contemporary resort.

Older →