Recently opened walkway in CityWalk. Roller coaster construction is behind the fence at left.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
Jump to a month
Show every monthAerial photos of roller coaster construction near a recently opened walkway in CityWalk.
Aerial photo of the recently opened walkway in CityWalk. There were previously stairs in a similar routing. Now a gentle slope. Behind the construction fence is a route that used to connect upper and lower walkways. Used as construction bypass until a few days ago.
Candy-cane lighting on the totems in CityWalk.
Color-changing totems in CityWalk. With Christmas garland at bottom.
Earl the Squirrel in CityWalk.
Venus Vocal Trio at the CityWalk fountain stage.
Color-changing totems in CityWalk.
Guests filling a new partially open walkway in CityWalk. Will be wider when complete. Roller coaster construction site at right.
Construction bypass closed between Universal Studios Florida and Hard Rock Orlando. New route open along waterfront.
Lights at the bandstand of Bob Marley-A Tribute to Freedom. In CityWalk.
For several weeks there have been two or more musical entertainers (or buskers) in CityWalk. Performances starting in the evening. In partnership with United Arts of Central Florida. Quickdraw Phillips seen here.
Possibly the last concrete forms for a new wall at the CityWalk waterfront. Railings added along prior sections cast for the wall.
Railing installation starting at the new CityWalk waterfront wall.
Five Nights at Freddy's section in the CityWalk Universal store.