the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
More filters ↓

Jump to a month

2026
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
May 25, 2026 10:59 AM

Photos of RGB floodlight testing in The Isle of Berk. Combinations of Red, Green, and Blue lamps create countless colors in the spectrum. Seeing only one lamp at a time identifies a lamp that is beginning to have problems. Floods overlap. This method identifies them easier.

April 24, 2026 4:04 PM

A nearly straight-down aerial look at dragons staged for flight over The Isle of Berk. In a Back of House area of Epic Universe.

February 13, 2026 7:27 PM

Aerial photo of The Isle of Berk. • Scrims added around Fyre Drill during refurbishment. Scrims at left arrow, and also the bridge opposite side. • Boats are staged at the right arrow.

September 20, 2025 11:19 PM

Aerial look at The Isle of Berk. Flying dragons are based out of the square of concrete in top right.

August 15, 2025 4:11 PM

Aerial overview of The Isle of Berk. If you're in Epic Universe today, very good chance you will see flying dragons. Look close at left center ...

June 8, 2025 9:35 AM

An aerial look back at construction in The Isle of Berk on Mar 14, 2024. 1 A structure under a bridge. 2 Theming in progress.

June 8, 2025 8:20 AM

Spotlights at the portal of The Isle of Berk in the closing show of Epic Universe.

May 21, 2025 9:20 PM

Aerial look at production staging on both sides of the portal of The Isle of Berk. Related to the Grand Opening of Epic Universe.

Older →