Aerial overview last night of construction at the Fast & Furious Hollywood Drift station. Track wrapping around the building is returning to unload.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
Jump to a month
Aerial overviews of construction at the Fast & Furious Hollywood Drift station.
Roofing underway at the Fast & Furious Hollywood Drift station. Aerial photos from this flight could be the last views inside until the attraction opens.
Aerial photos of construction at the Fast & Furious Hollywood Drift station and maintenance building.
Aerial overview of construction at the Fast & Furious Hollywood Drift station. Two switch track platforms. Train direction clockwise, allowing for train queuing before entering two unload/load areas.
Concrete forms almost gone from a recently cast switch track that will be in the upper level of the Fast & Furious Hollywood Drift station. Compare to aerial photo two days earlier in first Post of this Thread. Perimeter walkway also removed.
Aerial photo of workers finishing the pour of concrete for part of the second level of the Fast & Furious Hollywood Drift station. It's believed a switch track will be here. 📷March 13