June 28, 2026 8:23 PM

Current work for Fast & Furious Hollywood Drift behind Music Plaza. Tall supports for track where cars will ascend a hill before descending into brakes at the station. Underneath is the first launch of the cars. Speeding through the supports, adding visual thrill.

June 26, 2026 8:13 PM

Aerial photo of trucks in foreground staged with track to be delivered to the Fast & Furious Hollywood Drift construction site. A track section has also been delivered from the manufacturer to this staging yard.

June 26, 2026 7:57 PM

Aerial photo of trucks in foreground staged with track to be delivered to the Fast & Furious Hollywood Drift construction site. Truck at top has just delivered a track section to this staging yard.

June 26, 2026 6:50 PM

Aerial photo of Fast & Furious Hollywood Drift construction. At center is a refrigeration unit. Likely for cooling fins in the block brake above. At bottom left are foundations of switch track for The Spike.

June 26, 2026 6:36 PM

Aerial photo of Fast & Furious Hollywood Drift construction. High track at right is start of an overbanked curve. Cars here travelling right to left. Cars in the curve below travelling left to right, into a block brake. Track at left is for 170-ft tall Spike.

June 26, 2026 1:59 AM

In background are supports and track at the Fast & Furious Hollywood Drift station and behind Music Plaza. Track dives out of the first launch (and a likely show scene in the background building). Track will be added to the tall supports for cars to return to the station.