Aerial overview of construction at Villains Land and Piston Peak National Park.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
Jump to a month
Aerial photos of Big Thunder Mountain Railroad adjacent the construction sites of Villains Land and Piston Peak National Park. Tall fences were recently added for guest safety as well as show quality.
Aerial photos of construction in the Magic Kingdom backstage. West of Adventureland. Concrete walls are being cast for within the building.
Aerial photo of construction in the Magic Kingdom backstage. West of Adventureland. Also seen are the show barges of the Electrical Water Pageant in the service canal that connects to Seven Seas Lagoon. Bottom left are the Tom Sawyer Island rafts.
Aerial photo above the clouds at Magic Kingdom. 3100 ft.
Aerial photos of construction the fourth Magic Kingdom ferry. Will be named Meg Gilbert Crofton. Seems like more of the top deck is staged on ground at left. Stairs to be added where there are square openings in the deck.
Aerial photo of construction the fourth Magic Kingdom ferry. The Meg Gilbert Crofton. Stairs to be added where there are square openings in the top deck.
Aerial overview of Magic Kingdom.
Aerial photo of Big Thunder Mountain Railroad near construction of Piston Peak National Park and Villain's land.
Aerial overview of construction of Piston Peak National Park and Villain's land in Magic Kingdom.
A through-the-clouds aerial photo of Piston Peak National Park construction. Utility work at left. A conveyor is bringing in sand to fill between a retaining wall and theme park walkways. Pile growing at right.
Aerial photo of Piston Peak National Park construction. Green conveyor at center is bringing in sand to fill an area between the riverboat dock and a retaining wall. At same time the wall is being cast at left. Sand grading also in progress at left. Utility work also seen.
Aerial look at Piston Peak National Park construction. Concrete walls are being cast near the former riverboat dock, while sand is being filled at the other end. A green conveyor brings in the sand. Sand grading continues near the former keelboats dock. Utility work also seen.
Aerial photos of construction of Piston Peak National Park in Magic Kingdom. Sand is being filled and graded between the retaining wall and theme park walkways. There is also utility work in the site.
Aerial overview of Magic Kingdom.