May 23, 2025 5:19 PM

Aerial overview of the Epic Universe fireworks launch peninsula. Utility work in progress. At left is the Helios Grand Hotel parking garage, and the berm of the extended outdoor queue of Battle at the Ministry.

May 22, 2025 2:42 AM

Aerial look at the redo of the Sand Lake Rd interchange with I-4. Diverging diamond recently shifted. The cloverleaf from Sand Lake Rd WB to Turkey Lake Rd SB will replace a long-time congested left turn.

May 22, 2025 2:38 AM

Aerial look at where the diverging diamond in Sand Lake Rd at I-4 recently shifted. Former lanes seen between the barrels.

May 22, 2025 2:36 AM

Aerial overview of the redo of the Sand Lake Rd interchange with I-4. The diverging diamond ramps at left recently shifted to be even with the ramps across Sand Lake Rd.

May 10, 2025 10:06 AM

Aerial photos of work for a new ramp and exit at I-4 and SR 535 Apopka-Vineland Rd

May 10, 2025 9:52 AM

Aerial photos of the I-4 interchange with Central Florida Pwy (the SeaWorld Orlando interchange).

May 10, 2025 9:44 AM edited

Aerial photos of current work at the SR 538 Beachline interchange with I-4. The ramp from I-4 WB to SR 538 is being widened to two lanes.

May 10, 2025 9:33 AM

Aerial photo of the redo of the Sand Lake Rd interchange with I-4. I-4 WB Diverging diamond exit will soon shift. Eventually the left turn from Sand Lake WB to Turkey Lake SB becomes cloverleaf style ramp, merging with an I-4 WB ramp for Turkey Lake SB.

May 10, 2025 9:27 AM

Aerial photo of current work in the redo of the Sand Lake Rd interchange with I-4.

May 10, 2025 1:06 AM

Arrow in this aerial photo at a temporary cable crossing in Celestial Park. At left there is electrical work in progress at a pair of restaurants in development.

May 10, 2025 12:31 AM

Aerial overview of current construction of the Sand Lake Rd interchange with Kirkman Rd. Arrow at development a tunnel, so that pedestrians don't need a crosswalk to travel along Kirkman.

May 9, 2025 6:12 PM

A nearly straight-down aerial look at the tallest sections of Stardust Racers.