The Berm Record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
More filters ↓

Jump to a month

July 19, 2026 10:52 AM

Aerial photo of construction of a tunnel connecting two new lakes at Walt Disney World. Excavation for the lakes provided sand for Piston Peak National Park and Villains land. The tunnel is wide, indicating there's a long term plan for a wide road/median across it.

July 19, 2026 3:05 AM

Aerial photos of sand being placed between the existing grade of Frontierland and the retaining wall of Piston Peak National Park. Seems like the bridge will continue to be above a body of water.

July 19, 2026 2:51 AM

Aerial photos of sand being placed between the existing grade of Frontierland and the retaining wall of Piston Peak National Park. The boardwalk along the former Rivers of America waterfront recently closed.

July 19, 2026 2:36 AM

Aerial overview of sand being placed against the retaining wall of Piston Peak National Park. Perhaps matching to the existing grade of Frontierland.

July 19, 2026 2:21 AM

Aerial photos of infrastructure in development for Piston Peak National Park. Near The Haunted Mansion.

July 19, 2026 1:25 AM

Aerial photos of infrastructure in development for Villains Land at Magic Kingdom.

July 19, 2026 1:17 AM

An aerial look at infrastructure development for Villains Land. Arrows at ducts to access electrical/fiber conduits. Also what may be a storm drain. Near Big Thunder Mountain Railroad.

July 17, 2026 7:08 PM

Aerial photos of where Casita will be built in front of the Encanto ride in Animal Kingdom. La Casa Madrigal on a top of a hill. Similar to the design of the Haunted Mansion on top of a hill, with low walls in front of a berm.

July 12, 2026 10:00 AM

Aerial photo July 10 of Epic Universe fireworks preparation. A small team, working under a movable canopy for shade. Second photo, from Helios Grand Hotel July 7. Evening of the premiere of Celestial Goodnight. Possibly the full Team prepared and opened the show.

July 11, 2026 1:45 AM

Aerial photo of a carefully positioned crane in the Fast & Furious Hollywood Drift construction site. The crane is surrounded by footers for roller coaster supports.

June 23, 2026 2:00 AM

Aerial photo of the Piston Peak National Park construction site, and an overview including the Villain's land site.

Older →