The Berm Record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
More filters ↓

Jump to a month

Show every month
May 30, 2026 3:12 PM

Aerial overview of construction for the village in Tropical Americas at Animal Kingdom.

May 30, 2026 2:44 PM

At center of this aerial photo are concrete forms that seem like are foundations for a building seen in the Tropical Americas concept model (2nd photo, at arrow).

May 30, 2026 2:47 AM

Aerial overview of the staging yard for the Monstropolis roller coaster. Disney Skyliner EPCOT line at bottom left. Back of The American Adventure at top right.

May 30, 2026 2:42 AM

In first aerial photo are 8 wrapped rectangular openings. Seems like they might separate scenes in the Monstropolis door coaster. In second there is grey steel that might be for the at-ceiling first scene of the Monstropolis door coaster.

May 29, 2026 11:07 PM

Aerial photos of the development of Monstropolis in Disney's Hollywood Studios.

May 29, 2026 2:51 AM

Aerial photos of spotlights being added to the lawn in front of Helios Grand Hotel. A trench has been cut for electrical conduits. White concrete cylinders were cast to be foundations for the spotlights. Seems to be part of a new Epic Universe night show.

May 29, 2026 2:41 AM

Development of spotlights can be seen in this aerial photo. A trench has been cut in the lawn in front of Helios Grand Hotel for electrical conduits. White concrete cylinders were cast to be foundations for the spotlights. Seems to be part of a new Epic Universe night show.

May 28, 2026 2:16 AM

Aerial photos of roller coaster footer construction near a switch track platform for Fast & Furious Hollywood Drift. Look closely ... some pilings have been partially excavated. Months ago an auger drilled holes that were filled with concrete. Footers now in progress at pilings.

Older →