The Berm Record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
More filters ↓

Jump to a month

Show every month
April 26, 2026 10:52 PM

Apr 24 aerial photos of the Celestial Park event center construction site. Yellow waterproof barrier at an area being prepared for a concrete pour.

April 26, 2026 3:54 PM

Aerial look at the Piston Peak National Park site. Retaining wall footers change width between the former Rivers of America riverboat dock (at left) and Frontierland. There is also dirt staged top left. Retaining wall is likely to be higher here than left and right.

April 26, 2026 3:47 PM

Aerial look at the Piston Peak National Park site near Liberty Square. There's earth moving in progress at top right. Retaining wall construction near the former Rivers of America riverboat dock.

April 26, 2026 9:44 AM

Aerial photo of utility excavations near the exit of the theater in Monstropolis. At left, out of frame, is construction of the door roller coaster.

April 26, 2026 1:31 AM

Aerial look at where footers diverge at the Monstropolis roller coaster. Diverge to dual unload/load configuration.

April 26, 2026 1:30 AM

Aerial photos of Monstropolis roller coaster construction. The ride will be in the rebar section ... multiple levels. Diverging footers for dual unload/load configuration can be seen in the concrete at left.

April 26, 2026 1:13 AM

Aerial look at rebar, conduit, and footers prepared for a concrete pour in the Monstropolis roller coaster foundation.

April 26, 2026 12:59 AM

Aerial photo of Monstropolis roller coaster sections. Footers at top left, likely exit gift shop. To the right of this, diverging footers for dual unload. Ahead are evenly spaced footers for the load area, where trains will rise straight up. Most of the attraction at rebar area.

April 26, 2026 12:52 AM

Aerial overview of the Monstropolis roller coaster construction site. Concrete forms for the newest footers at top. Seems like exit gift shop area. Concrete in middle is load (at center) and unload (at right). Ride itself to be mostly in the area where there's rebar now.

Older →