Aerial photos of construction the fourth Magic Kingdom ferry. Will be named Meg Gilbert Crofton. Seems like more of the top deck is staged on ground at left. Stairs to be added where there are square openings in the deck.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+37 more Fewer
Jump to a month
Aerial photo of construction the fourth Magic Kingdom ferry. The Meg Gilbert Crofton. Stairs to be added where there are square openings in the top deck.
Fast & Furious Hollywood Drift construction.
Both switch track segments are in place for The Spike in Fast & Furious Hollywood Drift. Arrow at a division in the rail. Chain also seen holding the switch in place. When cars descend the other segment at right will be in place. Cars go to station.
Fast & Furious Hollywood Drift in the CityWalk area. (The Spike is out of view at right.)
Track segments are starting to connect in the CityWalk area of Fast & Furious Hollywood Drift. Arrow where cars will enter after after the first launch
Fast & Furious Hollywood Drift track that spans above what will be an access of the #HHN soundstage houses.
Fast & Furious Hollywood Drift track where a #HHN access will be for the soundstage houses.
Track so far curving high for cars entering the CityWalk area after first launch of Fast & Furious Hollywood Drift.
Current view of ends of tracks and supports at Fast & Furious Hollywood Drift near CityWalk. A mystery continues about how all these ends will tie together. Arrows where cars are entering from first launch, and returning to the station.
In this photo of Fast & Furious Hollywood Drift construction: 1 Track for cars entering switch track for The Spike. 2 Track for cars leaving The Spike, returning to station. 3 Switch track.
First of two track sections placed for switch track for The Spike of Fast & Furious Hollywood Drift. Arrows at the divisions of rails. This track is for returning to the station. Just to the left is track curving toward the switch track. Cars entering The Spike.
Current platform construction at the block brake in Fast & Furious Hollywood Drift.
Scaffolding added at base of The Spike in the Fast & Furious Hollywood Drift construction site.
Arrows in these photos at Fast & Furious Hollywood Drift track for cars to return to the station. DOT direction of travel arrow on a support seen in 2nd photo indicates the ride flow.