Aerial photo of structural frame being added at the second building of Fast & Furious Hollywood Drift. There's also structural frame along the track towards it.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+11 more Fewer
Jump to a month
At center is a current track end in the construction of Fast & Furious Hollywood Drift. This track is after the tall overbanked curve. At right is walkway construction along the nicknamed "Speed Bump"
At center is current exterior of a section of the Fast & Furious Hollywood Drift station.
View of the length of Fast & Furious Hollywood Drift. From CityWalk, behind the Music Plaza stage, to the station. Supports at right span a #HHN walkway for the soundstage houses.
A photo looking down much of the length of Fast & Furious Hollywood Drift. 1 Access walkway construction along the nicknamed "Speed Bump" 2 Launch of the ride. Switch track from station is horizontal line. 3 Support spanning a #HHN walkway 4 Walkway at track returning to station
Supports added for Fast & Furious Hollywood Drift at a #HHN Halloween Horror Nights access of the soundstage houses.
Top Hat of Velocicoaster seen through structure of a block brake in Fast & Furious Hollywood Drift.
A #HHN Halloween Horror Nights scenic element pointing towards The Spike of Fast & Furious Hollywood Drift.
Some of the details in the construction of Fast & Furious Hollywood Drift.
Current construction of Fast & Furious Hollywood Drift.
A photo of the instant the new Celestial Goodnight fireworks show debuted. If you were there, you might be this group photo! The show is fantastic new version of the much-loved original closing fountain show.
Billboard replacement near the exit of Universal Studios Florida. Way back it was an electronic sign. More recently marketing panels had been custom attached over the sign. This is likely changing to have same attachments for panels as the other billboards in this area.
Track in development that returns to the Fast & Furious Hollywood Drift station. In second photo the lower level track is launch from the station. Foam currently protecting the propulsion fins.
Fast & Furious Hollywood Drift construction.
CityWalk and Music Plaza views of recently added track for Fast & Furious Hollywood Drift.