the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,792
photos
21,321
posts
spanning
November 2023 – August 2026
latest
August 3, 2026
More filters ↓

Jump to a month

June 29, 2026 12:16 AM

Aerial photos of Catchlight Crossings construction. Affordable housing that Universal is developing near Epic Universe.

June 28, 2026 10:48 PM

Aerial photos of construction outside of SEAQuest: Legends of the Deep. A suspended ride vehicle dark ride opening later this year in SeaWorld Orlando.

June 28, 2026 10:40 PM

Aerial photo of ride track staged for SEAQuest: Legends of the Deep. A suspended ride vehicle dark ride opening later this year in SeaWorld Orlando.

June 28, 2026 10:34 PM

Aerial photo of ride track for SEAQuest: Legends of the Deep. A suspended ride vehicle dark ride opening later this year in SeaWorld Orlando.

June 28, 2026 8:38 PM

Hot Dog Hall of Fame is closing soon. Limited opportunity to sit in seats from many baseball parks. This @JimHillMedia podcast has a feature at the end that tells the story of how Rainforest Cafe and this CityWalk location are related. https://podcasts.jimhillmedia.com/show/the-universal-joint/from-rainforest-cafe-to-hot-dog-hall-of-fame-with-steven-schussler-ep-108/

June 28, 2026 8:27 PM

Current in-park view of Fast & Furious Hollywood Drift track that is near the station.

June 28, 2026 8:23 PM

Current work for Fast & Furious Hollywood Drift behind Music Plaza. Tall supports for track where cars will ascend a hill before descending into brakes at the station. Underneath is the first launch of the cars. Speeding through the supports, adding visual thrill.

June 28, 2026 8:18 PM

Fin style differences in a block brake of Fast & Furious Hollywood Drift. Fins at left are fixed position. Retractable at right.

June 28, 2026 7:46 PM

Contractor supports used in the construction of Fast & Furious Hollywood Drift. In background at left is a shipping crate with fins.

June 28, 2026 7:42 PM

Contractor supports used in the construction of Fast & Furious Hollywood Drift. In background is a temporary ratchet and cable holding a track support in place for the tall overbanked curve.

June 28, 2026 7:35 PM

Staging recently changed of the top two track sections for The Spike . Offering a clearer view of what will be a vertical twist up and then back down. At the construction site of Fast & Furious Hollywood Drift

June 28, 2026 7:29 PM

Edge-on view of the top two track sections that will form the 170-ft tall Spike of Fast & Furious Hollywood Drift.

June 28, 2026 6:56 PM

Crow tours of Fast & Furious Hollywood Drift: "This is where an tall overbanked curve will soar." "Rotating cars will 'drift' over this span." "Follow me." "Track might be placed for the curve this week. Seems to be 135° overbanking." 🤭

June 28, 2026 4:28 AM

When the rehearsal of Celestial Goodnight stopped tonight. Helios Grand Hotel remained colorful for a moment. Then resumed normal lighting.