Roofing in progress at the entrance of Jurassic Park River Adventure.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+40 more Fewer
Jump to a month
A pair of concrete forms in progress for the gateway to Monstropolis in Disney's Hollywood Studios. An identical pair also to the left of this photo. Actively being assembled by workers today.
Mickey and some Pals at front of Disney's Hollywood Studios.
Remaining structure of the Sinbad theater now leaning backward. As part of the demolition process in Islands of Adventure.
Both ends of track added to Fast & Furious Hollywood Drift. Cars will accelerate here and rise up The Spike.
Track sightings in the Fast & Furious Hollywood Drift construction site. Near CityWalk.
Track has been added at the other end of The Speed Bump at base of The Spike in Fast & Furious Hollywood Drift. Cars to be accelerated when rising up.
All that remains in the Sinbad theater demolition in Islands of Adventure.
A family restroom has been in development for several months at front of Islands of Adventure. Door switch and occupancy light recently added. Restroom might be available soon.
Track supports added today for a Bunny Hop in Fast & Furious Hollywood Drift. Visible just past the admission kiosks of Universal Studios Florida.
A Bunny Hop in development at Fast & Furious Hollywood Drift. Seems like the peak is designed so that equipment can pass underneath. A boom lift, for example, needs to inspect both sides of the track and supports as part of regular maintenance.
A look at track supports for a Bunny Hop in Fast & Furious Hollywood Drift. At base of the tower for the 170-ft tall Spike element. Bunny Hop seems designed so that equipment can pass underneath. Such as a boom lift for regular track inspection and maintenance.
At right is a Bunny Hop in development at bottom of The Spike of Fast & Furious Hollywood Drift. At center is grey track for curve of another segment in the ride. At left, on ground, is likely the next track support to be placed. At end of the Bunny Hop, and up The Spike.
Bunny Hop in development at bottom of The Spike at Fast & Furious Hollywood Drift. A smaller Bunny Hop has supports added earlier, out of frame at right. Cars will hop before rising up the 170-ft tower, with a twist. Then descend through the hops into the rest of the ride.
Markings that seem related to the upcoming construction of Luke Combs' Category 10 in CityWalk.