the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
More filters ↓

Jump to a month

June 6, 2026 9:43 PM

A pair of concrete forms in progress for the gateway to Monstropolis in Disney's Hollywood Studios. An identical pair also to the left of this photo. Actively being assembled by workers today.

June 6, 2026 12:45 AM

Remaining structure of the Sinbad theater now leaning backward. As part of the demolition process in Islands of Adventure.

June 5, 2026 11:24 PM

Track has been added at the other end of The Speed Bump at base of The Spike in Fast & Furious Hollywood Drift. Cars to be accelerated when rising up.

June 5, 2026 12:45 AM

A family restroom has been in development for several months at front of Islands of Adventure. Door switch and occupancy light recently added. Restroom might be available soon.

June 5, 2026 12:28 AM

Track supports added today for a Bunny Hop in Fast & Furious Hollywood Drift. Visible just past the admission kiosks of Universal Studios Florida.

June 5, 2026 12:13 AM

A Bunny Hop in development at Fast & Furious Hollywood Drift. Seems like the peak is designed so that equipment can pass underneath. A boom lift, for example, needs to inspect both sides of the track and supports as part of regular maintenance.

June 5, 2026 12:06 AM edited

A look at track supports for a Bunny Hop in Fast & Furious Hollywood Drift. At base of the tower for the 170-ft tall Spike element. Bunny Hop seems designed so that equipment can pass underneath. Such as a boom lift for regular track inspection and maintenance.

June 4, 2026 11:58 PM

At right is a Bunny Hop in development at bottom of The Spike of Fast & Furious Hollywood Drift. At center is grey track for curve of another segment in the ride. At left, on ground, is likely the next track support to be placed. At end of the Bunny Hop, and up The Spike.

June 4, 2026 11:47 PM

Bunny Hop in development at bottom of The Spike at Fast & Furious Hollywood Drift. A smaller Bunny Hop has supports added earlier, out of frame at right. Cars will hop before rising up the 170-ft tower, with a twist. Then descend through the hops into the rest of the ride.

Older → ↩ Back to the newest