the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,792
photos
21,321
posts
spanning
November 2023 – August 2026
latest
August 3, 2026
More filters ↓

Jump to a month

June 5, 2026 12:17 AM

Seems like billboards will return soon to these walls at the plaza in front of Universal Studios Florida. This section of CityWalk walkway closed for Fast & Furious Hollywood Drift construction. A walkway route is likely to return.

June 5, 2026 12:13 AM

A Bunny Hop in development at Fast & Furious Hollywood Drift. Seems like the peak is designed so that equipment can pass underneath. A boom lift, for example, needs to inspect both sides of the track and supports as part of regular maintenance.

June 5, 2026 12:06 AM edited

A look at track supports for a Bunny Hop in Fast & Furious Hollywood Drift. At base of the tower for the 170-ft tall Spike element. Bunny Hop seems designed so that equipment can pass underneath. Such as a boom lift for regular track inspection and maintenance.

June 4, 2026 11:58 PM

At right is a Bunny Hop in development at bottom of The Spike of Fast & Furious Hollywood Drift. At center is grey track for curve of another segment in the ride. At left, on ground, is likely the next track support to be placed. At end of the Bunny Hop, and up The Spike.

June 4, 2026 11:47 PM

Bunny Hop in development at bottom of The Spike at Fast & Furious Hollywood Drift. A smaller Bunny Hop has supports added earlier, out of frame at right. Cars will hop before rising up the 170-ft tower, with a twist. Then descend through the hops into the rest of the ride.

June 4, 2026 1:25 AM

At right are track supports added today at the base of the tower for The Spike of Fast & Furious Hollywood Drift. At left is track curving for a different segment of the ride.

June 4, 2026 1:18 AM

In foreground are Fast & Furious Hollywood Drift track and a related support with Direction of Travel arrow. In background, track supports added today at base of The Spike.

June 4, 2026 1:07 AM

Track supports added today at base of The Spike for Fast & Furious Hollywood Drift. Notice there are connections along the rail.

June 4, 2026 1:03 AM

In background are track supports added today at base of The Spike for Fast & Furious Hollywood Drift.

June 4, 2026 12:58 AM

Track supports added today at base of The Spike for Fast & Furious Hollywood Drift.

June 3, 2026 1:08 AM

Fast & Furious Hollywood Drift tower construction aligned as vertical stabilizer of Jimmy Buffett's plane. Hemisphere Dancer.

June 3, 2026 1:01 AM

On of the unusual support connections at The Spike for Fast & Furious Hollywood Drift.

June 3, 2026 12:54 AM

Front of Universal Studios Florida view of tower for The Spike of Fast & Furious Hollywood Drift. Look close, the connections curve up with a twist.

Older → ↩ Back to the newest