Aerial overviews of Fast & Furious Hollywood Drift construction near CityWalk.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,792
- photos
- 21,321
- posts
- spanning
- November 2023 – August 2026
- latest
- August 3, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
Jump to a month
Aerial photos of roller coaster construction near the former Blue Man Group theater. For Fast & Furious Hollywood Drift.
Aerial photos of Fast & Furious Hollywood Drift construction. A 170-ft tall Spike element is in development. Also track was placed here last week.
Aerial photo of track that was placed last week near CityWalk for Fast & Furious Hollywood Drift.
Aerial photo of Fast & Furious Hollywood Drift construction. Cars will head down a straight line of track running diagonally from top right toward the waterfront. A 170-ft tall Spike element is in progress. Cars will rise up and then descend into the remainder of the ride.
Aerial photo of construction in progress for the 170-ft tall Spike element of Fast & Furious Hollywood Drift. Also seen is the track placed last week.
Aerial photos of roller coaster footer construction near a switch track platform for Fast & Furious Hollywood Drift. Look closely ... some pilings have been partially excavated. Months ago an auger drilled holes that were filled with concrete. Footers now in progress at pilings.
Aerial photos of Fast & Furious Hollywood Drift construction behind Music Plaza.
At top center of this aerial photo is construction of the service building for Fast & Furious Hollywood Drift. It seems like other kinds of ride vehicle and show maintenance will be supported too.
Aerial photos of track and supports in progress at the station of Fast & Furious Hollywood Drift. Structural frame for the station recently increased too. Trusses for the roof in progress.
Track supports at right were recently added near the station of Fast & Furious Hollywood Drift. There's also additional structural frame for the station.
A nearly straight-down aerial photo of construction at the station of Fast & Furious Hollywood Drift. • Supports recently added for track on other side of the switch track for trains arriving at unload/load. • New concrete at left center where utility work recently completed.
Aerial look at Universal Studios Florida. The Fast & Furious Hollywood Drift construction site spans left and right. From the CityWalk water front and along the soundstages.
More structural steel raised for the station of Fast & Furious Hollywood Drift. Towards the switch track platform for trains arriving at the dual unload/load.
A fun sequence of photos of the Fast & Furious Hollywood Drift staging yard. 1 Afternoon May 21. Track segments on open bed trucks. 2 Morning May 22. Trucks moved to site overnight. Track seen in-place later near CityWalk. 3 Afternoon May 22. Supports ready to move for The Spike.