the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,792
photos
21,321
posts
spanning
November 2023 – August 2026
latest
August 3, 2026
More filters ↓

Jump to a month

May 28, 2026 1:59 AM

At top center of this aerial photo is construction of the service building for Fast & Furious Hollywood Drift. It seems like other kinds of ride vehicle and show maintenance will be supported too.

May 28, 2026 1:48 AM edited

Aerial photos of track and supports in progress at the station of Fast & Furious Hollywood Drift. Structural frame for the station recently increased too. Trusses for the roof in progress.

May 28, 2026 1:41 AM

Track supports at right were recently added near the station of Fast & Furious Hollywood Drift. There's also additional structural frame for the station.

May 28, 2026 1:26 AM

A nearly straight-down aerial photo of construction at the station of Fast & Furious Hollywood Drift. • Supports recently added for track on other side of the switch track for trains arriving at unload/load. • New concrete at left center where utility work recently completed.

May 28, 2026 1:05 AM

Aerial look at Universal Studios Florida. The Fast & Furious Hollywood Drift construction site spans left and right. From the CityWalk water front and along the soundstages.

May 24, 2026 2:09 AM

Current state of 170-ft tall Spike element of Fast & Furious Hollywood Drift. • Switch track to be on the wide footers behind the line of supports (at right). • In foreground are the supports raised so far for the tower.

May 23, 2026 6:00 PM

12 skylights (spotlights) in development behind the fireworks launch at Epic Universe.

Older → ↩ Back to the newest