Aerial look at Universal Studios Florida. The Fast & Furious Hollywood Drift construction site spans left and right. From the CityWalk water front and along the soundstages.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,792
- photos
- 21,321
- posts
- spanning
- November 2023 – August 2026
- latest
- August 3, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+11 more Fewer
Jump to a month
More structural steel raised for the station of Fast & Furious Hollywood Drift. Towards the switch track platform for trains arriving at the dual unload/load.
A fun sequence of photos of the Fast & Furious Hollywood Drift staging yard. 1 Afternoon May 21. Track segments on open bed trucks. 2 Morning May 22. Trucks moved to site overnight. Track seen in-place later near CityWalk. 3 Afternoon May 22. Supports ready to move for The Spike.
Supports raised so far for the 170-ft tall Spike element of Fast & Furious Hollywood Drift.
Current state of 170-ft tall Spike element of Fast & Furious Hollywood Drift. • Switch track to be on the wide footers behind the line of supports (at right). • In foreground are the supports raised so far for the tower.
At right is start of the framework to support the 170-ft tall Spike element of Fast & Furious Hollywood Drift. Near the CityWalk waterfront.
Some of the summer season Jaws theming in Universal Studios Florida.
A walk-in photo op in Universal Studios Florida. The billboard in the Jaws movie.
A monster in Minion Land in Universal Studios Florida.
A monster has arrived in Minion Land in Universal Studios Florida.
Many billboards being replaced in the Universal Studios Florida entrance plaza.
New location of the crane at the Fast & Furious Hollywood Drift station. In front of the New York skyline mural.
Aerial photos of construction at the Fast & Furious Hollywood Drift station and maintenance building.
Aerial photos of construction at the station for Fast & Furious Hollywood Drift. Steel is being placed for floor of the dual load/unload. Structural steel was also recently added near the switch track platform, and roof trusses are being placed.
Aerial photo of construction at the station for Fast & Furious Hollywood Drift. Protective foam covers the tracks inside while work is in progress overhead. Structural steel was recently added near the switch track platform. Roof trusses in progress.