the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,810
photos
21,336
posts
spanning
November 2023 – August 2026
latest
August 4, 2026

6,081 photos match

Clear all Grid Feed
More filters ↓

Jump to a month

May 19, 2026 10:53 PM

Aerial photo of demolition underway at the Sinbad theater in The Lost Continent. Mystic Fountain courtyard in foreground closed a few days ago.

May 19, 2026 10:40 PM

Aerial photo of demolition underway in The Lost Continent at right. Mystic Fountain courtyard at center closed a few days ago.

May 19, 2026 10:29 PM

Aerial photo of a recently closed area of The Lost Continent. Mystic Fountain at center.

May 19, 2026 10:26 PM

Aerial photo of Mystic Fountain. Access door removed on the reverse side.

May 19, 2026 1:04 AM

Poseidon's Fury demolition fence now extends from the gift shop at left to the bridge to Seuss Landing. Forming a corridor along Mythos Restaurant.

May 17, 2026 10:43 PM

Demolition fence at the former Sinbad theater has moved outward. Restrooms (at right, out of frame) are available.

May 17, 2026 2:10 AM

Aerial photo of Disney Lakeshore Lodge construction. Lobby at top left will have a view across the lazy river courtyard.

May 17, 2026 2:06 AM

Aerial photos of lazy river construction in Disney Lakeshore Lodge. It has a temporary crossing of dirt, braced by retaining walls.

May 17, 2026 1:42 AM

Aerial photo of construction of a wing of Disney Lakeshore Lodge. Likely the quiet pool. Also seen is dock construction.

Older → ↩ Back to the newest