the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
More filters ↓

Jump to a month

May 15, 2026 7:54 PM

Aerial photo of construction of a new Magic Kingdom ferry. Sections of the hull are transported to the service marina North of Contemporary Resort. Hull then welded together in dry dock. More hull sections soon.

May 15, 2026 7:34 PM

A new Magic Kingdom ferry is seen in development at top left of this aerial photo. Compare to a ferry at the dock. Sections of the hull are transported here and welded together. More sections arriving soon, at the service marina North of Contemporary Resort.

May 15, 2026 7:28 PM

At top of this aerial photo is construction of a new Magic Kingdom ferry. Sections of the hull have been transported here and welded together. More sections soon. Compare to size of trailers at right. Also to size of a ferry at dock. Liberty Belle riverboat also at dock.

May 15, 2026 7:19 PM

At left in this aerial photo is construction of new Magic Kingdom ferry boat. Sections of the hull have been transported by truck and welded together in dry dock of a service marina north of Contemporary Resort. Compare to the ferry at right. Also Liberty Belle riverboat.

May 15, 2026 7:06 PM

Aerial photo of: • Liberty Belle, the former Magic Kingdom riverboat. • A Magic Kingdom ferry. • A platform for transferring large boats. • Carriages are seen for transferring between dry dock service areas.

May 8, 2026 1:08 PM

Aerial photos of a line of track supports near foundations for switch track. Arrows on top of the supports show the Direction of Travel (DOT) of cars will be toward the foundations.

April 26, 2026 6:32 PM

Aerial photos of Magic Kingdom construction staging near the North end of the current widening of Floridian Way.

April 26, 2026 4:44 PM edited

Aerial photos of infrastructure work for Villains land and Piston Peak National Park.

April 26, 2026 4:35 PM

Aerial photo of a truck spraying water to control dust in the Villains land construction site. Two trains in testing in Big Thunder Mountain railroad at left. Haunted Mansion exterior in refurbishment at right.

April 26, 2026 4:26 PM

Aerial photo of trees transplanted from the Rivers of America area, to a location North of Small World. Could be these trees will be moved again later to Piston Peak National Park.

April 26, 2026 4:19 PM

In this aerial overview of construction for Piston Peak National Park and Villains land: 1 Cast Member access of the Utilidor. 2 Trees transplanted from the Rivers of America area. 3 Waterway being filled in that connected Rivers of America to a service canal.

April 26, 2026 4:08 PM

Aerial photo of the Piston Peak National Park construction site, relative to Adventureland. A recently started project is at top right.

April 26, 2026 3:54 PM

Aerial look at the Piston Peak National Park site. Retaining wall footers change width between the former Rivers of America riverboat dock (at left) and Frontierland. There is also dirt staged top left. Retaining wall is likely to be higher here than left and right.

April 26, 2026 3:47 PM

Aerial look at the Piston Peak National Park site near Liberty Square. There's earth moving in progress at top right. Retaining wall construction near the former Rivers of America riverboat dock.

Older → ↩ Back to the newest