Aerial photo of construction of a new Magic Kingdom ferry. Sections of the hull are transported to the service marina North of Contemporary Resort. Hull then welded together in dry dock. More hull sections soon.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
+25 more Fewer
+23 more Fewer
Jump to a month
A new Magic Kingdom ferry is seen in development at top left of this aerial photo. Compare to a ferry at the dock. Sections of the hull are transported here and welded together. More sections arriving soon, at the service marina North of Contemporary Resort.
At top of this aerial photo is construction of a new Magic Kingdom ferry. Sections of the hull have been transported here and welded together. More sections soon. Compare to size of trailers at right. Also to size of a ferry at dock. Liberty Belle riverboat also at dock.
At left in this aerial photo is construction of new Magic Kingdom ferry boat. Sections of the hull have been transported by truck and welded together in dry dock of a service marina north of Contemporary Resort. Compare to the ferry at right. Also Liberty Belle riverboat.
Aerial photo of: • Liberty Belle, the former Magic Kingdom riverboat. • A Magic Kingdom ferry. • A platform for transferring large boats. • Carriages are seen for transferring between dry dock service areas.
Aerial photos of a line of track supports near foundations for switch track. Arrows on top of the supports show the Direction of Travel (DOT) of cars will be toward the foundations.
Aerial photos of Magic Kingdom construction staging near the North end of the current widening of Floridian Way.
Aerial photos of infrastructure work for Villains land and Piston Peak National Park.
Aerial photo of a truck spraying water to control dust in the Villains land construction site. Two trains in testing in Big Thunder Mountain railroad at left. Haunted Mansion exterior in refurbishment at right.
Aerial photo of trees transplanted from the Rivers of America area, to a location North of Small World. Could be these trees will be moved again later to Piston Peak National Park.
In this aerial overview of construction for Piston Peak National Park and Villains land: 1 Cast Member access of the Utilidor. 2 Trees transplanted from the Rivers of America area. 3 Waterway being filled in that connected Rivers of America to a service canal.
Aerial photo of the Piston Peak National Park construction site, relative to Adventureland. A recently started project is at top right.
Aerial overviews of the Piston Peak National Park construction site in Magic Kingdom.
Aerial look at the Piston Peak National Park site. Retaining wall footers change width between the former Rivers of America riverboat dock (at left) and Frontierland. There is also dirt staged top left. Retaining wall is likely to be higher here than left and right.
Aerial look at the Piston Peak National Park site near Liberty Square. There's earth moving in progress at top right. Retaining wall construction near the former Rivers of America riverboat dock.