Many track support sections are staged for Fast & Furious Hollywood Drift near CityWalk.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,792
- photos
- 21,321
- posts
- spanning
- November 2023 – August 2026
- latest
- August 3, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+37 more Fewer
Jump to a month
At center is the first Fast & Furious Hollywood Drift structural steel raised for track near CityWalk.
Current work at what might be The Glob theater in Monstropolis. Arrows at what seem to be same color of paint.
Aerial look at a crane staged for placing track and supports for Fast & Furious Hollywood Drift near CityWalk.
Aerial overview of Fast & Furious Hollywood Drift construction near CityWalk. A crane has been staged for placing track and supports.
Aerial photo of switch track construction at Fast & Furious Hollywood Drift. In first photo, concrete forms are being removed. Including underneath. Footers also being cast for track to access the service building.
Aerial overview of construction at the Fast & Furious Hollywood Drift station. Two switch track platforms. Train direction clockwise, allowing for train queuing before entering two unload/load areas.
Aerial photos of construction at the Fast & Furious Hollywood Drift station.
Aerial photo of Fast & Furious Hollywood Drift construction. • Station at right. • Maintenance building at left. • Two switch track platforms. • Train direction clockwise. Allowing trains to queue for unload/load at left.
Aerial photo of construction of the maintenance building for Fast & Furious Hollywood Drift, and other uses. Arrow where cars are hiding from Grad Bash and Gradventure.
Aerial overview of construction at Fast & Furious Hollywood Drift. There's also maintenance in two fenced street areas at left.
Aerial photo of track staged for Fast & Furious Hollywood Drift. Twists can be seen in many of the curved sections.
Aerial photos of some of the track staged for Fast & Furious Hollywood Drift. Foam blocks will be used to protect track in areas where there is overhead work. One of these blocks has been seen staged at the attraction site, at a switch track platform.
Aerial overview of staging of track and supports for Fast & Furious Hollywood Drift.
Aerial overviews of the redo of the I-4 interchange with Sand Lake Rd. • Former EB lanes overpass demolition continues. • Turkey Lake Rd ramp opens May 2 (tomorrow)