the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,792
photos
21,321
posts
spanning
November 2023 – August 2026
latest
August 3, 2026

903 photos in May 2026

Clear all Grid Feed
More filters ↓

Jump to a month

Show every month
May 2, 2026 1:15 PM

Aerial photo of construction of the maintenance building for Fast & Furious Hollywood Drift, and other uses. Arrow where cars are hiding from Grad Bash and Gradventure.

May 2, 2026 1:09 PM

Aerial photo of work in the street in front of the entrance of Fast & Furious Hollywood Drift. F&F site itself has increased slightly. Seems like the F&F fence itself will be restored further out when parades resume in a few weeks.

May 2, 2026 12:01 PM

Aerial photos of some of the track staged for Fast & Furious Hollywood Drift. Foam blocks will be used to protect track in areas where there is overhead work. One of these blocks has been seen staged at the attraction site, at a switch track platform.

May 2, 2026 11:28 AM

Aerial photos of sand being placed in a spur of the Epic Universe property. Universal Blvd at Pointe Plaza Ave.

May 2, 2026 11:23 AM

Aerial overviews of the site preparation Universal is doing in the Epic Universe area.

May 2, 2026 11:19 AM

Aerial photos with details of the site preparation Universal is doing in the Epic Universe area. Along Universal Blvd. • Mesh is placed over the site. • Two layers of sand. Two types. • Workers add scale to these photos.

May 2, 2026 11:11 AM

Aerial photos of trucks and cones/stakes in a site Universal is preparing with sand. Epic Universe area property at Universal Blvd and Pointe Plaza Ave.

May 2, 2026 11:07 AM

Aerial overview of sand Universal is placing on Epic Universe area property along Universal Blvd. • Two types of sand. Layers can be seen at the edge. • Cones and stakes mark areas at left • Mesh is seen in foreground. Sand here soon.

May 2, 2026 3:11 AM

Aerial overviews of the redo of the I-4 interchange with Sand Lake Rd. • Former EB lanes overpass demolition continues. • Turkey Lake Rd ramp opens May 2 (tomorrow)

May 2, 2026 3:08 AM

Aerial photos of demolition of the overpass of the former EB lanes of I-4 at Sand Lake Rd. Wider overpass to be built. EB traffic currently using an overpass that will become Express lanes.

Older → ↩ Back to the newest