Aerial look at Islands of Adventure. In foreground is the refurbishment of Jurassic Park River Adventure.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,792
- photos
- 21,321
- posts
- spanning
- November 2023 – August 2026
- latest
- August 3, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+40 more Fewer
Jump to a month
Aerial photo of demolition in front of the former Poseidon's Fury in The Lost Continent.
Aerial photos of demolition in The Lost Continent. Areas outside of the former Sinbad show.
Aerial photos of the exit area of the former Eighth Voyage of Sindbad Stunt Show. Demolition in progress in The Lost Continent.
Back of House aerial photos of demolition of the former Eighth Voyage of Sindbad Stunt Show.
Aerial photos today of the refurbishment of Hogwarts Castle. • Dining hall at left complete • Scaffolding being removed from the main tower • Mix of work in open view and behind scrims at right • In 2nd photo, view of scaffolding recently added above the greenhouse queue
Aerial photo showing all horizontal decorative beams removed from the movie theater Back of House at CityWalk. There's scaffolding at left.
Siding almost complete on the Fast & Furious Hollywood Drift maintenance building. On the side facing the attraction entrance.
Longtime Islands of Adventure fans remember when this tree was near the Lagoon. It's special: another tree grew around a palm tree. The tree-pair was moved here when VelociCoaster construction started. It's recovering from the harsh February freeze. High branches still brown.
Current themed paint at Hogwarts Castle. Towers in progress, will soon look familiar. Like above rocks at right. Roof also with paint in progress. 2nd photo has device used to rappel on roof. Crow on roof in first photo provides actual scale of this forced perspective.
A crest pending themed paint on Hogwarts Castle.
Current view of Hogwarts Castle from Hogsmeade. Scrims being removed from the main tower. Another section complete. The front area at left will soon be in the theming/repainting process being done in the open at the right two towers. Other repainting is behind scrims.
Repainting continues on these two towers of Hogwarts Castle. Overall stone colors are being washed over the painted individual variations in stone. It's starting to look familiar. Most repainting done behind scrims. This is a rare opportunity to see the theming process.
Scaffolding is partially removed from the main tower of Hogwarts Castle. Another section complete in the repainting/refurbishment.
Scaffolding is being removed from the main tower of Hogwarts Castle. Indicating that repainting is complete at the tower.