Apr 24 aerial photos of the Celestial Park event center construction site. Yellow waterproof barrier at an area being prepared for a concrete pour.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,826
- photos
- 21,350
- posts
- spanning
- November 2023 – August 2026
- latest
- August 6, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+40 more Fewer
Jump to a month
Scrims removed from the refurbishment of the main tower of Hogwarts Castle. Scaffolding likely to be removed soon.
Aerial photo of bus loop construction at Polynesian Resort.
Aerial photos of Floridian Way widening near Polynesian Resort.
Aerial photos of roundabout construction in the widening of Floridian Way.
Aerial photos of the North end of the current widening of Floridian Way.
Aerial photos of Magic Kingdom construction staging near the North end of the current widening of Floridian Way.
Aerial photo of the Vacation Kingdom of the World. In foreground is the widening of Floridian Way.
Aerial photos of infrastructure work for Villains land and Piston Peak National Park.
Aerial photo of a truck spraying water to control dust in the Villains land construction site. Two trains in testing in Big Thunder Mountain railroad at left. Haunted Mansion exterior in refurbishment at right.
Aerial photo of trees transplanted from the Rivers of America area, to a location North of Small World. Could be these trees will be moved again later to Piston Peak National Park.
In this aerial overview of construction for Piston Peak National Park and Villains land: 1 Cast Member access of the Utilidor. 2 Trees transplanted from the Rivers of America area. 3 Waterway being filled in that connected Rivers of America to a service canal.
Aerial photo of the Piston Peak National Park construction site, relative to Adventureland. A recently started project is at top right.
Aerial overviews of the Piston Peak National Park construction site in Magic Kingdom.
Aerial look at the Piston Peak National Park site. Retaining wall footers change width between the former Rivers of America riverboat dock (at left) and Frontierland. There is also dirt staged top left. Retaining wall is likely to be higher here than left and right.