Aerial photos of Monstropolis roller coaster construction. The ride will be in the rebar section ... multiple levels. Diverging footers for dual unload/load configuration can be seen in the concrete at left.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
Jump to a month
Aerial photos of rebar, conduit, and footers prepared for a concrete pour in the Monstropolis roller coaster foundation.
Aerial look at rebar, conduit, and footers prepared for a concrete pour in the Monstropolis roller coaster foundation.
Aerial photo of Monstropolis roller coaster sections. Footers at top left, likely exit gift shop. To the right of this, diverging footers for dual unload. Ahead are evenly spaced footers for the load area, where trains will rise straight up. Most of the attraction at rebar area.
Aerial overview of the Monstropolis roller coaster construction site. Concrete forms for the newest footers at top. Seems like exit gift shop area. Concrete in middle is load (at center) and unload (at right). Ride itself to be mostly in the area where there's rebar now.
Aerial photo of construction of the Monstropolis roller coaster.
Aerial overviews of all of the construction in Tropical Americas in Animal Kingdom.
Aerial overviews of construction in Tropical Americas in Animal Kingdom.
Aerial photo of rebar being placed for Casita, or La Casa Madrigal, in front of the Encanto ride. Sloped areas will become footers for supporting tall parts of the building.
Aerial photo of construction of the entrance to the Encanto ride in Animal Kingdom. Rebar being placed for Casita, or La Casa Madrigal. Sloped areas will become footers for supporting tall parts of the building. Ride exit at right.
Aerial photos of construction of a carousel in Tropical Americas. Yellow waterproof barrier placed for next concrete floor pour.
Aerial overviews of the development of Fast & Furious Hollywood Drift near CityWalk.
Aerial photo of construction staging of Fast & Furious Hollywood Drift near the CityWalk waterfront walkway.
Aerial photos of rectangular footers for switch track in Fast & Furious Hollywood Drift. Up the Spike element, and then falling back down to a different route.
Aerial photos of electrical transformers recently added in the Fast & Furious Hollywood Drift work site.