the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,833
photos
21,355
posts
spanning
November 2023 – August 2026
latest
August 7, 2026

25,833 photos archived

Grid Feed
More filters ↓

Jump to a month

April 24, 2026 2:15 AM

This area of the Hogwarts Castle refurbishment was recently revealed. Arrow at left at a detail that will likely be repainted by use of a boom lift. Two arrows at right where scaffolding was secured to the building's steel frame. Holes to be patched and themed.

April 24, 2026 2:08 AM

Scaffolding fully removed from this completed area of the Hogwarts Castle refurbishment. This area was behind scrims, so there's no way to know for certain, but the repainting process was likely similar to what we can see now in open areas of work.

April 24, 2026 2:01 AM

Yellow crane at the Fast & Furious Hollywood Drift station construction site can be spotted from many places in background of the demolition of The Lost Continent. Including here, through the former Eighth Voyage of Sindbad Stunt Show theater.

April 24, 2026 1:45 AM

Recently placed track in the construction site of Fast & Furious Hollywood Drift. Two runs. Station out of frame at left will have dual load/unload. Wood railings at right at a concrete platform for switch track.

April 24, 2026 1:22 AM

A 3-photo collage of the graphics at the entrance of the new Universal Legacy Store.

April 24, 2026 1:14 AM

Current theming of the new Universal Legacy Store. Fresh graphic style, which can also be spotted above the scrims at the windows. Seems likely that some items sold in the store will feature this fresh style.

April 24, 2026 1:06 AM

New video loop marketing all the aspects of CityWalk. You might enjoy looking through the keywords in the second photo. Above the new Universal Legacy Store.

April 23, 2026 2:39 AM

A look at construction of The Spike of Fast & Furious Hollywood Drift. At center (arrow) is a line of footers for the rising up into The Spike, and falling back down. Arrow at right at rows of rectangular footers for the switch track.

April 23, 2026 2:31 AM

There are many details to zoom in and explore in this photo of the Fast & Furious Hollywood Drift work site. At center is a recently cast concrete platform. Likely for another switch track near the station. Scissor lifts are on second floor of the service building construction.

April 23, 2026 2:24 AM

At center is a recently cast concrete platform at Fast & Furious Hollywood Drift. Jacks are still underneath. There are also circular castings with bolts on the platform. Seems like this is for a second switch track near the station.

Older → ↩ Back to the newest