New video loop marketing all the aspects of CityWalk. You might enjoy looking through the keywords in the second photo. Above the new Universal Legacy Store.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+40 more Fewer
Jump to a month
Show every monthThe Incredible Hulk and Aventura Hotel.
A look at construction of The Spike of Fast & Furious Hollywood Drift. At center (arrow) is a line of footers for the rising up into The Spike, and falling back down. Arrow at right at rows of rectangular footers for the switch track.
There are many details to zoom in and explore in this photo of the Fast & Furious Hollywood Drift work site. At center is a recently cast concrete platform. Likely for another switch track near the station. Scissor lifts are on second floor of the service building construction.
At center is a recently cast concrete platform at Fast & Furious Hollywood Drift. Jacks are still underneath. There are also circular castings with bolts on the platform. Seems like this is for a second switch track near the station.
At center is structure visible from within Universal Studios Florida for the station roof of Fast & Furious Hollywood Drift.
Track placed for Fast & Furious Hollywood Drift. Another track run will likely be placed soon on the second line of pillars. Both track runs spanning to where the wood railings are seen. Railings are around the platform for switch track.
A look at track placed for Fast & Furious Hollywood Drift. Wood railings are around the switch track platform near the station.
Two of the serving counters at Louie's Italian Restaurant in Universal Studios Florida are closed for refurbishment. One counter and about 1/3 of the seating remain available.
Most trees removed from the former The Eighth Voyage of Sinbad theater area. Second photo Apr 2. Demolition of The Lost Continent in progress.
This might be the last day trees are seen separating the former Eighth Voyage of Sinbad theater and the former Poseidon's Fury. Demolition of The Lost Continent in progress.
This might be the last day trees are seen separating the former Eighth Voyage of Sinbad theater and the former Poseidon's Fury. Demolition of The Lost Continent in progress.
Muggles view of the refurbishment of Hogwarts Castle. As seen from Dr Phillips High School, across the street. Zoom in and there's variation in the repainting of the tall tower roof shingles.
Today and yesterday in the repainting of the roof of the primary tower of Hogwarts Castle. Darker hues applied over random base colors. The randomness adds to visual appeal.
Sighting of the repainting of Hogwarts Castle from Hogsmeade.