the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
More filters ↓

Jump to a month

April 13, 2026 1:12 AM

Last of the BK Whopper Bar is closing in several days. There were 3. CityWalk is the last location. To be replaced with a Five Guys.

April 11, 2026 8:55 PM

Aerial photo of scaffolding at Hogwarts Castle, and also as seen from CityWalk. Both photos Apr 10.

April 11, 2026 8:33 PM

Luke Combs' Category 10 to be built in CityWalk along the waterfront. Between the two arrows seen in this Apr 10 aerial photo.

April 11, 2026 8:27 PM

Horizontal steel beams were recently removed from behind a portion of the CityWalk movie theaters. Similar to removal from behind a portion of Margaritaville (see first Post this Thread). Aerial photo Apr 10 of unaffected areas facing Universal Blvd.

April 11, 2026 4:38 PM

Aerial overviews of Fast & Furious Hollywood Drift construction near CityWalk.

April 11, 2026 4:21 PM

Aerial photo of where switch track will be for Fast & Furious Hollywood Drift near CityWalk. Tall stakes added for visibility to equipment. Earthmoving in progress to fill in the excavation.

April 7, 2026 12:41 AM

Canals in the CityWalk water system are regularly refreshed with dye. Usually not very noticeable. However, overcast ambient light from today's rain caused the fresh color to stand out.

April 5, 2026 9:54 AM

Aerial photo of where Luke Combs' Category 10 will be built in CityWalk. 33,000 sq ft, three stories.

April 5, 2026 9:47 AM

Aerial photo of where a bus ramp directly into the CityWalk loop is under construction.

March 27, 2026 9:05 PM

Aerial overview of construction at CityWalk. A bus-only lane is in development, direct into the loop from Universal Blvd. Barriers in the UOR parking exit at left are for a pedestrian bypass of the construction.

March 27, 2026 9:01 PM

Yellow line in this aerial photo is the construction bypass at CityWalk for guests walking from/to I-Drive hotels. A turn lane is in development at bottom left. Bus-only direct access to the loop.

March 27, 2026 8:53 PM

Aerial photo of recently started construction for bus-only lane directly into the CityWalk loop.

March 24, 2026 12:16 AM

Newest refresh of landscaping in CityWalk. At the walkway to Royal Pacific resort.

March 21, 2026 12:58 AM

Mardi Gras beads were recently cleared from gardens near the CityWalk pedestrian bridge. Beads that didn't reach nearby trees have landed in the gardens again.

Older → ↩ Back to the newest