Aerial photos of the sand mine for the development of Piston Peak and Villain's land. Sand is staged in piles until needed, in areas at bottom and right in the 3rd photo.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+21 more Fewer
Jump to a month
At center of this aerial photo are the Walt Disney World fireworks storage bunkers. West of Magic Kingdom. Also at center, to the right, is a sand mine. Sand for development of Piston Peak and Villain's land. The mine eventually becomes a lake, connected by canal.
Aerial look at canals of the Walt Disney World water management system. A new canal is being built, connecting to what is currently a sand mine for Magic Kingdom construction. The sand mine eventually becomes a lake. WDW fireworks storage bunkers are at right.
Aerial photo of a sand mine West of Magic Kingdom that will become a lake, and part of the water management system of Walt Disney World. Sand is moved to staging areas seen at left until needed in Piston Peak and Villain's land development.
Aerial photo of Villain's land site preparation near The Haunted Mansion show building. • A recently made steep cliff at top center. • Earthmoving near the queue. This sand is from the Seven Seas Lagoon excavation. Moved here as a plateau, around the Magic Kingdom Utilidor.
In this aerial photo of the Villain's land site a tree at right is being prepared for transplanting. It will be moved to the left, with other trees that used to be in the forest along Rivers of America. It's likely these trees will be moved again. Perhaps as Piston Peak theming.
Aerial overview of construction sites of • Villains land • Piston Peak National Park At center is a tree that will be transplanted from the forest that used to line Rivers of America. Other trees that were moved are at top left. It's possible these trees will move again...
Aerial overview of construction sites of • Piston Peak National Park • Villains land
Aerial photos of where Rivers of America used to connect through a lock and canal to Seven Seas Lagoon.
Aerial photos of site preparation for Tropical Americas in Animal Kingdom.
Aerial photos of site preparation in Tropical Americas near the former Restaurantosaurus.
Aerial photo of the demolition of the wall that separated Muppets Courtyard from Grand Avenue. Construction fence recently moved outwards. Part of the preparation to retheme to Monstropolis.
Aerial photo of the demolition of the wall that separated Muppets Courtyard from Grand Avenue. Construction fence recently moved outwards. Part of the preparation to retheme to Monstropolis.
Aerial photo of the demolition of the wall that separated Muppets Courtyard from Grand Avenue. Construction fence recently moved outwards. Part of the preparation to retheme to Monstropolis. Also seen in foreground is scaffolding rising around one of the themed water tanks.
Aerial overviews of construction for the Fast & Furious Hollywood Drift roller coaster.