Seems like landscaping is being removed from the site of Luke Combs' Category 10 in CityWalk.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,826
- photos
- 21,350
- posts
- spanning
- November 2023 – August 2026
- latest
- August 6, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+40 more Fewer
Jump to a month
Current work for a concrete block walled structure in the Fast & Furious Hollywood Drift site. As seen from CityWalk.
Concrete forms removed from sides of a recent concrete pour. It's believed that switch track will be here for Fast & Furious Hollywood Drift. Upper level of the station.
Recently updated graphics on the Fast & Furious Hollywood Drift construction fence.
Beyond the Universal gateway arch, earth's shadow is underneath the cotton candy pink clouds lit by the sunset.
Aerial photos of current work near CityWalk for Fast & Furious Hollywood Drift.
At center of this aerial photo is the start of concrete block construction for a utility building in the site of Fast & Furious Hollywood Drift.
Aerial photos of current work on Fast & Furious Hollywood Drift, behind Music Plaza.
Aerial overview of current construction at Fast & Furious Hollywood Drift. Two Hogwarts Express trains are passing each other in bottom left.
Aerial photo of current construction at the station of Fast & Furious Hollywood Drift.
Aerial photo of station construction at Fast & Furious Hollywood Drift. The road bed from top left was seen being placed in aerial photos 5 days earlier. Road used for the new crane location in the work site.
Aerial photo of current for the service building of Fast & Furious Hollywood Drift. There's a frame at bottom right that seems to be for a service elevator. Perhaps the second level will be for maintenance/inspection of other ride vehicles.
Aerial photo with the new location of a crane in the Fast & Furious Hollywood Drift construction site. Seems like it can be used for both the service building and the station.
A very faded sign in the CityWalk bus loop. On a walkway that has been little used by guests, until a construction bypass recently opened.
A lane of a parking exit from Universal is closed. In use by guests between CityWalk and I-Drive. Scrim seen in 3rd photo is to discourage guests from crossing through the bus loop. This bypass in place due to work for a new access to the loop for buses from Universal Blvd.