the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,810
photos
21,336
posts
spanning
November 2023 – August 2026
latest
August 4, 2026
More filters ↓

Jump to a month

February 22, 2026 10:09 AM

Mix of color palettes at Disney's Hollywood Studios. At left are the Kem Webber inspired colors from the Walt Disney Studios in Burbank. Long time part of this theme park's design. At right are new colors of the Walt Disney Studios Courtyard in development at the park.

February 22, 2026 2:08 AM

One of two freeze-damaged palms with a new frond emerging near Spaceship Earth. The unusual 2-night harsh freeze was 3 weeks ago.

February 22, 2026 1:46 AM

A tradition in American construction is a topping off ceremony. When the last or the highest beam of new structure is raised and placed, with an American flag and a tree on that beam. Seen here is that last beam of the Encanto show building. With signatures too!

February 22, 2026 12:36 AM

Seems like this Osprey is sitting on eggs now, She built this nest around a scare owl. On top of an I-4 facing billboard on Universal property at the Universal Blvd overpass.

February 21, 2026 5:43 PM

Five ring logo on the EPCOT fountain designed by Norm Inouye.

February 18, 2026 12:53 AM

Some of the characters on lighting in Shrek’s Swamp.

February 17, 2026 12:26 AM

A baking sheet has been emptied in the Mardi Gras Tribute Store. With glue residue remaining where props were fastened.

February 16, 2026 2:31 AM

Seasonal refurbishment underway at the CineSational show. Projectors removed from platforms. Water level dropping in the Universal lagoon.

Older → ↩ Back to the newest