Changing color lighting has returned for Mardi Gras at this New York facade.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,810
- photos
- 21,336
- posts
- spanning
- November 2023 – August 2026
- latest
- August 4, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+40 more Fewer
Jump to a month
Some props have changed in the Mardi Gras Tribute Store. Notably, a pair of small baguettes removed, with glue residue left behind. First photo today Feb 15, second photo Feb 9.
Aerial photo of the Volcano Bay bus terminal. Guests reach the park entrance (top left) through a tunnel under an I-4 ramp. The 3 tall roof peaks at left were recently added. Previously was open sky. The roof peak at far left is for Team Members.
Aerial photo of a recently roofed section of the Volcano Bay bus terminal. It previously had open sky bus stops.
Aerial photos of construction staging at the former Star Wars Galactic Starcruiser hotel. Conversion in progress to an Imagineering office building.
Aerial overview of the former Star Wars Galactic Starcruiser hotel. Being converted to an Imagineering office building.
Aerial photo of the pedestal where Dinosaur Sue was displayed in Dinoland USA. This area recently closed to become a play area in the retheming as Tropical Americas.
Aerial overview of the retheming of Muppets Courtyard to Monstropolis.
Feb 13 aerial look at some of the brick facing removed at former Muppet*Vision 3D. Compare to in-park photo on Feb 14 in first Post of this Thread.
Aerial photo of boom lifts at the former Muppet*Vision theater. Some demolition in progress on the roof at center. Some of the brick facing of the building has been removed.
Aerial look at changes in progress at the former PizzeRizzo outdoor seating.
Aerial photo of storefronts remaining from Muppets Courtyard. Including Pizzerizzo. Retheming in progress to Monstropolis.
Aerial overviews of construction for the Monstropolis roller coaster. Utility conduits are being buried. Concrete floor is in progress. Additional rectangles of concrete are curing.
Scaffolding at a refurbishment of Yacht Club resort.
Details of where brick facing was removed recently in the former Muppets Courtyard.