the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,908
photos
21,408
posts
spanning
November 2023 – August 2026
latest
August 10, 2026

25,908 photos archived

Grid Feed
More filters ↓

Jump to a month

February 15, 2026 1:43 AM

Feb 13 aerial look at some of the brick facing removed at former Muppet*Vision 3D. Compare to in-park photo on Feb 14 in first Post of this Thread.

February 15, 2026 1:38 AM

Aerial photo of exterior changing at the former Muppet*Vision 3D theater. A demolition in progress on the roof. Some of the brick facing has been removed.

February 15, 2026 1:34 AM

Aerial photo of boom lifts at the former Muppet*Vision theater. Some demolition in progress on the roof at center. Some of the brick facing of the building has been removed.

February 15, 2026 1:29 AM

Aerial look at changes in progress at the former PizzeRizzo outdoor seating.

February 15, 2026 1:20 AM

Aerial photos of construction at what may be The Glob Theater in Monstropolis.

February 15, 2026 1:10 AM

Aerial photo of storefronts remaining from Muppets Courtyard. Including Pizzerizzo. Retheming in progress to Monstropolis.

February 15, 2026 1:04 AM

Aerial photo with a comparison of the size of Monstropolis city, in bottom left, with the roller coaster show building site at top.

February 15, 2026 12:42 AM

Aerial photos of electrical conduit work in the Monstropolis roller coaster site. In first photo, helicopter shadow is seen where a safety vest is reflecting Sun directly behind the camera.

February 15, 2026 12:33 AM

Aerial photo of construction of the Monstropolis roller coaster. Electrical conduits are being placed and buried at left. Concrete floor in progress at right. An additional concrete floor with pilings is underneath the sand.

February 15, 2026 12:24 AM

Aerial overviews of construction for the Monstropolis roller coaster. Utility conduits are being buried. Concrete floor is in progress. Additional rectangles of concrete are curing.

Older → ↩ Back to the newest