Aerial overview of the retheming of Muppets Courtyard to Monstropolis.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,908
- photos
- 21,408
- posts
- spanning
- November 2023 – August 2026
- latest
- August 10, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+40 more Fewer
Jump to a month
Feb 13 aerial look at some of the brick facing removed at former Muppet*Vision 3D. Compare to in-park photo on Feb 14 in first Post of this Thread.
Aerial photo of exterior changing at the former Muppet*Vision 3D theater. A demolition in progress on the roof. Some of the brick facing has been removed.
Aerial photo of boom lifts at the former Muppet*Vision theater. Some demolition in progress on the roof at center. Some of the brick facing of the building has been removed.
Aerial look at changes in progress at the former PizzeRizzo outdoor seating.
Aerial look at exterior changes to the former Muppet*Vision 3D theater. Might be rethemed as The Glob theater in Monstropolis.
Aerial photos of construction at what may be The Glob Theater in Monstropolis.
Aerial photo of storefronts remaining from Muppets Courtyard. Including Pizzerizzo. Retheming in progress to Monstropolis.
Aerial photo with a comparison of the size of Monstropolis city, in bottom left, with the roller coaster show building site at top.
Aerial photo of the location of the Monstropolis roller coaster at Disney's Hollywood Studios.
Aerial overview of the development of the Monstropolis roller coaster at Disney's Hollywood Studios.
Aerial overview of the development of the Monstropolis roller coaster at Disney's Hollywood Studios.
Aerial photos of electrical conduit work in the Monstropolis roller coaster site. In first photo, helicopter shadow is seen where a safety vest is reflecting Sun directly behind the camera.
Aerial photo of construction of the Monstropolis roller coaster. Electrical conduits are being placed and buried at left. Concrete floor in progress at right. An additional concrete floor with pilings is underneath the sand.
Aerial overviews of construction for the Monstropolis roller coaster. Utility conduits are being buried. Concrete floor is in progress. Additional rectangles of concrete are curing.