February 15, 2026 1:38 AM

Aerial photo of exterior changing at the former Muppet*Vision 3D theater. A demolition in progress on the roof. Some of the brick facing has been removed.

February 15, 2026 1:34 AM

Aerial photo of boom lifts at the former Muppet*Vision theater. Some demolition in progress on the roof at center. Some of the brick facing of the building has been removed.

February 15, 2026 1:29 AM

Aerial look at changes in progress at the former PizzeRizzo outdoor seating.

February 15, 2026 1:20 AM

Aerial photos of construction at what may be The Glob Theater in Monstropolis.

February 15, 2026 1:10 AM

Aerial photo of storefronts remaining from Muppets Courtyard. Including Pizzerizzo. Retheming in progress to Monstropolis.

February 15, 2026 1:04 AM

Aerial photo with a comparison of the size of Monstropolis city, in bottom left, with the roller coaster show building site at top.

February 15, 2026 12:42 AM

Aerial photos of electrical conduit work in the Monstropolis roller coaster site. In first photo, helicopter shadow is seen where a safety vest is reflecting Sun directly behind the camera.

February 15, 2026 12:33 AM

Aerial photo of construction of the Monstropolis roller coaster. Electrical conduits are being placed and buried at left. Concrete floor in progress at right. An additional concrete floor with pilings is underneath the sand.

February 15, 2026 12:24 AM

Aerial overviews of construction for the Monstropolis roller coaster. Utility conduits are being buried. Concrete floor is in progress. Additional rectangles of concrete are curing.

February 15, 2026 12:15 AM

Aerial photo of moisture barrier being placed in a section of the Monstropolis roller coaster site. Another concrete floor section will be cast soon. Electrical conduit are being buried at right. A fire hydrant is being added at bottom center.

February 15, 2026 12:00 AM

Aerial photo of a construction team placing yellow moisture barrier for the next section of concrete floor in the Monstropolis roller coaster building. An additional layer of concrete is underneath the orange sand. Pilings underneath that concrete. Interesting square shapes...