All buildings near Walt Disney Studios Courtyard have new colors. One of the original colors seen at top right of this aerial photo.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,908
- photos
- 21,408
- posts
- spanning
- November 2023 – August 2026
- latest
- August 10, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+40 more Fewer
Jump to a month
Aerial photos of construction of Walt Disney Studios Courtyard.
Aerial photo of trees and pavement recently added in Walt Disney Studios courtyard.
Aerial photos of work in progress at the entrance of Magic of Animation. An overhang roof is being removed. A tall Sorcerer Hat will be here.
In-park photos Feb 14 of where overhang roof has been removed at Magic of Disney Animation. Preparation for adding a tall Sorcerer Hat. Compare to Feb 13 aerial photo in first Post of this Thread.
In this aerial photo of the entrance to Magic of Disney Animation: 1 - New colors on the exterior of a theater. 2 - Workers painting railings. 3,4 - Overhang roof being removed behind the scaffolding.
Aerial look at construction at front of the Walt Disney Studios Courtyard.
Aerial look at construction at front of the Walt Disney Studios Courtyard.
Aerial overview of the development of the Walt Disney Studios Courtyard.
Aerial overviews of Fast & Furious Hollywood Drift roller coaster construction near CityWalk.
Aerial overviews of Fast & Furious Hollywood Drift roller coaster construction near CityWalk.
Aerial photo of Fast & Furious Hollywood Drift construction near the CityWalk waterfront.
Aerial photos of Fast & Furious Hollywood Drift roller coaster construction.
Aerial photos of rectangular concrete forms at the construction site of Fast & Furious Hollywood Drift. Seems like where a sliding track switch would be.
Aerial photos of construction of a utility building at Fast & Furious Hollywood Drift.